pile driver or pile driver stands at the construction site waiting for the marking of the pile field for driving the piles of the foundation of the house, selective focus
Files for Editorial Use Only cannot be used for any commercial purposes.
Title | Type | Size | DPI | Filesize |
---|
Med | JPG | 1000 x 667px | 300dpi | 0.61 Mb. |
Small | JPG | 500 x 334px | 300dpi | 0.16 Mb. |
Huge | JPG | 4650 x 3100px | 300dpi | 9.68 Mb. |
Buy on Shutterstock
Keywords
calculation,
stack,
strength,
pile,
project,
building,
pile driver,
estimate,
immersion,
work,
impact,
dirt,
construction site,
equipment,
economy,
leveling,
koper,
driving,
preparatory work,
vibro,
hammer,
pile driving,
waiting,
uprooting,
technique,
industry,
cycle,
house,
remove,
clay,
modern,
design,
construction,
piles,
heap,
profit,
architecture,
dirty,
move,
black soil,
clean,
improvement,
soil cutting,
clearing,
foundation pit,
pushing,
structure,
marking,
marking work,
pile field